Features:
PTFE high-frequency welding machine for high-temperature PTFE welding characteristics, joint manufacturers of military heating fever developed high-temperature heat pipe, the heating speed, long life, with high-precision intelligent temperature controller, temperature control accuracy of 1 degree, through a number of The PTFE welding factory in-depth understanding of the continuous optimization of operating methods, the current models have been very mature for many well-known enterprises in the industry.
1. AC380V power supply, heating power
2. Heating time control precision
3. The maximum working temperature up to 500 ¡æ
4. In addition to the device has a suitable heat welding function, but also with cooling function, due to the high hardness of PTFE material heating temperature, after melting must be promptly cooled to make the film after welding more smooth and more beautiful and more solid
5. Double cylinder work, pressurization and stability
6. Large span of the machine, convenient material place
7. Machine welding machine board from the ground can be customized according to customer requirements
8 using PID temperature control technology, high precision temperature control
Rock Zhen equipment purchase considerations
Company
Plastic packaging machine, automatic high frequency machine, high frequency, packaging machine heat, high frequency machine, high frequency heat sealing machine, high frequency welding machine, high frequency welding machine, high frequency equipment, fusing machine
About the company
Shanghai Yan Zhen Automation Equipment Co., Ltd. was established in 2006, after more than 10 years of growth and development, the Secretary after several changes, is located in the beautiful scenery and long history of Shanghai Zhujiajiao ancient town of Qingpu District
About equipment
All equipment by our independent research and development production, the first mold proofing, until the customer satisfaction and cooperation
about the price
Equipment prices from different power, configuration, model, craft decisions, subject to negotiation, not allowed to quote
About quality
All equipment parts have been formal channels of procurement, domestic and foreign well-known brand suppliers
About Logistics
Car transport, shipping post I Division commitment (except for special circumstances)
About equipment installation conditions
Customers take delivery and installation by the buyer, before delivery, the buyer must provide gas source, 380V power supply, unloading forklift
About after sales
Equipment from the date of manufacture free of charge year warranty and lifetime maintenance, parts warranty damage or failure to repair equipment failure, the company only charge parts costs and on-site service fee, in the shortest possible time to provide solutions and on-site service
About installation and debugging
Equipment sent by the demand side prior to shipment to the factory inspection, acceptance and sent to the need to plant, Division I will arrange professionals on-site guidance
About delivery time
Standard machines are available from stock, non-standard custom negotiators need to negotiate, delivery time to be required to pay the deposit after the deposit
Contact information
18964959113¡¢13611901916