Scope of application:
150KW PVC water bed high frequency welding machine for inflatable medical pad, inflatable kayak, inflatable boat, water bed, inflatable mattress, car mattress, air cushion, inflatable toys, inflatable castle, inflatable water park, inflatable water trampoline, Inflatable water slide, inflatable water roller, floating row, swimming pool, inflatable sofa and other large area PVC, PU, EVA and other products welding.
Features
1, turn on the power, warm up for 5 minutes.
2, install the mold, adjust the parallelism, the mold and the next mold correct alignment.
3, preheating, some products have heating aid, more convenient welding.
4, open the hand automatic switch, the product into the mold, click the auto start button, the device moves as follows: Turntable turn to bit - the nose automatically drop - fall time to - high frequency start role in the product - welding time To - high frequency stop to enter cutting phase - cutting time to enter cooling phase - cooling time to - head up (height is controlled by rise time) - turntable rotates automatically for welding of next station - manipulator Remove the finished product (optional), this is the entire workflow, so cycle.
5, During commissioning, the welding time can be lengthened properly for debugging. In the meantime, the welding current should be increased gradually. Each time the mold is replaced, it should be reset to zero. The adjustment should be fine-tuned until the product is welded properly. If it is not in place Can be repeated several times, set the current, and then adjust the welding time system, so that in a short time to complete the product.
Rock Zhen equipment purchase considerations
Company
Plastic packaging machine, automatic high frequency machine, high frequency, packaging machine heat, high frequency machine, high frequency heat sealing machine, high frequency welding machine, high frequency welding machine, high frequency equipment, fusing machine
About the company
Shanghai Yan Zhen Automation Equipment Co., Ltd. was established in 2006, after more than 10 years of growth and development, the Secretary after several changes, is located in the beautiful scenery and long history of Shanghai Zhujiajiao ancient town of Qingpu District
About equipment
All equipment by our independent research and development production, the first mold proofing, until the customer satisfaction and cooperation
about the price
Equipment prices from different power, configuration, model, craft decisions, subject to negotiation, not allowed to quote
About quality
All equipment parts have been formal channels of procurement, domestic and foreign well-known brand suppliers
About Logistics
Car transport, shipping post I Division commitment (except for special circumstances)
About equipment installation conditions
Customers take delivery and installation by the buyer, before delivery, the buyer must provide gas source, 380V power supply, unloading forklift
About after sales
Equipment from the date of manufacture free of charge year warranty and lifetime maintenance, parts warranty damage or failure to repair equipment failure, the company only charge parts costs and on-site service fee, in the shortest possible time to provide solutions and on-site service
About installation and debugging
Equipment sent by the demand side prior to shipment to the factory inspection, acceptance and sent to the need to plant, Division I will arrange professionals on-site guidance
About delivery time
Standard machines are available from stock, non-standard custom negotiators need to negotiate, delivery time to be required to pay the deposit after the deposit
Contact information
18964959113¡¢13611901916